TOYOTA MOTOR MANUFACTURING OF CANADA |
Location: |
WOODSTOCK, ONTARIO |
Description: |
Project Team
Owner: | | Toyota Motor Manufacturing of Canada |
Architect: | | Giffels Associates Ltd. |
Structural Engineer: | | Giffels Associates Ltd. |
General Contractor: | | Toyota Manufacturing |
Steel Fabricator: | | MGT Steel |
Steel Detailer: | | Baseline Drafting / M&G Steel / Tresman Steel / Draft-Tech |
Steel Erector: | | Island Steel Erectors |
Project Description
This facility was made up of 3 new buildings (Press, Weld and
Plastics) totalling approximately 565,000 sq. ft. MGT Steel
supplied and installed 4000 tons of structural steel and joist
over the 3 phases of the project. Erection started on
November 13 2006 and was complete, along with deck, on
March 2 2007.
|
|
|
|
|
|
|
|
|
|