FERRERO CHOCOLATES
Location: BRANTFORD, ONTARIO
Description: Project Team

Owner:Ferrero Chocolates
Architect:GPA Associates
Structural Engineer:Kazmar Engineering
General Contractor:AECON Buildings
Steel Fabricator:MGT Steel
Steel Detailer:Tresman Steel / M&G Steel
Steel Erector:Island Steel Erectors


Project Description

This facility is comprised of an 825,000 sq. ft. production plant plus a separate office, utility and guardhouse buildings. There was approximately 3,800 tons of structural steel on this project. Erection took place between March and September 2005.